1600 Smith St.
Houston, TX 77002

(713) 754-4530
(713) 754-4568

Deepstar - Technology Development
Deepstar Members

Deepstar Menu Login
User Name:
Password:
Remember Login:
 
Forgot your password?
 
Or to join under your organization, click here.
 

 



Memorial Day - DeepStar Closed Memorial Day - DeepStar Closed on 26-May-08
Top 5 Top 5
9400 Quarterly Meeting 9400 Quarterly Meeting on 3-Jun-08
Top 5 Top 5
9300 Quarterly Meeting 9300 Quarterly Meeting on 4-Jun-08
Top 5 Top 5
9200 Quarterly Meeting 9200 Quarterly Meeting on 5-Jun-08
Top 5 Top 5
Independence Day - DeepStar Closed Independence Day - DeepStar Closed on 4-Jul-08
Top 5 Top 5
Labor Day - DeepStar Closed Labor Day - DeepStar Closed on 1-Sep-08
Top 5 Top 5
9400 Quarterly Meeting 9400 Quarterly Meeting on 2-Sep-08
Top 5 Top 5

 

 

 

 

Deepstar - Technology Development for Deepwater Research

 

 

Search Committees

 
Search By

11 Records Found. Displaying Page 1:
CAP - Contributor Panel
 Mission: The Contributor Panel (CAP) is comprised of all DeepStar Contributor Member Companies. The CAP provides invaluable input and guidance to the DeepStar Management Committee who direct the funding and research that DeepStar executes.

x000 - Geosciences Committee
 Mission: The ultra-deepwater part of the GOM poses many geological and geophysical challenges to the exploitation of hydrocarbons. Many of these challenges are related to a combination of the UDW environment and the presence of a regionally extensive thick salt canopy which overlies the prospective subsalt section. The combination of a thick water column and thick salt layer pose a formidable challenge for acquiring data and accessing resources. The environmental conditions and costs associated with t

x100 - Regulatory Committee
 Mission: The Regulatory Committee provides liaison between the DeepStar technical committees and governmental regulators such as the Minerals Management Services and the US Coast Guard. The objective of the committee centers on the exchange of technical information between the working technical groups in DeepStar and regulatory representatives of the MMS and USCG. The Regulatory Committee also works and communicates with leading industry organizations, such as the OOC, API, and others. The objectiv

x200 - Flow Assurance Committee
 Mission: The goal of the Flow Assurance Committee is to assure reliable and economic production in deepwater by the appropriate design and operation through prediction, management remediation of deposition and line plugs.

x300 - Subsea Systems Committee
 Mission: The mission of the Subsea Systems Committee is to develop technology and qualify equipment to enable the deployment of “subsea facilities for 60 mile tie-backs from 10,000 foot water depth.”

x400 - Floating Systems Committee
 Mission: The role of the Floating Systems Committee is to further technology and fill gaps related to deepwater floating systems and their associated moorings and risers.

x500 - Drilling and Completion Committee
 Mission: On the Drilling and Completion Committee, members share their experiences and data to improve deep water drilling operations.

x600 - Management Committee
 Mission: The Management Committee is the administration and technical support committee for the DeepStar Project. The committee is headed by the Program Director who oversees the DeepStar leadership and administration responsibilities.

x700 - Reservoir Engineering Committee
 Mission: This committee looks at trends that are of significant generic interest to the industry, while avoiding detailed reservoir issues where participants have competitive concerns. The committee has assembled the best available public domain information for use in learning the global characteristics of deepwater GOM reservoirs.

x800 - Met-Ocean Committee
 Mission: This committee aims to improve knowledge and modeling capabilities of the GOM circulation, which will provide more accurate facility design criteria and reduce downtime during deepwater drilling operations.

x900 - Systems Engineering Committee
 Mission: The Systems Engineering Committee has the responsibility for analyzing existing and/or potential technology gaps and bringing them to the attention of the committee best suited to carry out further work in the specific technology area.